US Highway 117 Sewer Expansion

Purpose

To increase available sewer capacity and availability along the US Highway 117 Bypass Corridor.

Project Description

This project proposes to install a regional pump station in the area of Rhodes Ave connecting through an 8” force main from the new pump station to the town’s main force main on US Highway 117 north of the Burgaw City Limits.  White Tractor Lift Station will also be connected into the regional pump station through the use of a force main and gravity sewer system.  The gravity section will allow for additional develop to be added to the system without additional pump stations. The project, as proposed, is projected to add capacity for up to 450 units with the availability to increase with minor modifications.

Project Location

US Hwy 117 Sewer Expansion 

Project Cost

$1,900,000  -  Per projections from the Preliminary Engineering Report (PER)

Engineering Firm

McKim & Creed

Project Status

Design Phase & Easement Acquisition