Purpose
To make improvements to the intersections along NC Hwy 53 through the downtown corridor.
Project Description
This project proposes to:
- Widen the turning radius at the intersection of E Bridgers St/N Walker St.
- Widen the turning radius at E Wilmington St/N Walker St.
- Install signal light at Wright St/E Wilmington St intersection.
- Replace signal light at E Wilmington St/N Walker St.
- Perform additional streetscape improvements.
Project Location
Project Cost
Funded through NCDOT
Engineering Firm
NCDOT Project
Project Status
Awaiting Scheduling per NCDOT Prioritization. Currently scheduled for 2025.